DEVELOPMENT STUDY, 2021 · PORTLAND, MAINE

Custom House Wharf

A working-waterfront pier taken from listing to a phased redevelopment: zoning, massing, a building-by-building schedule, the model and the returns.

Aerial rendering of the redeveloped Custom House Wharf pier among the surrounding waterfront blocks
SITE
2.8 acres
LISTED PRICE
$11.0M
TOTAL PROJECT COST
$56.9M
AT STABILISATION
10 buildings
HOLD
10 years

01

Site

The pier, building by building: what stays, what is renovated and what is replaced.

Plan of the pier with each building labelled by its number, from C-90 at the street to CH-39 at the water
Proposed building plan.

02

Zoning and massing

Two zones govern the pier. Each was massed to its height, setback and use rules before anything was priced.

Massing diagram of the waterfront zone buildings with floor areas and heights
Waterfront zone massing.
Massing diagram of the B-3 zone building: retail at grade and four residential floors above
B-3 zone massing.

03

Schedule

Every building gets units, area, rent and a plan, then a place in the phasing so existing rents carry the project through construction.

Building schedule table listing each building's units, gross and rentable area, stabilised rent and plan
Building schedule.
Phasing chart showing each building moving from current rents through demolition, renovation or new build to market rents over eleven years
Phasing schedule.

04

Model and returns

A cash-flow model with a promote structure for the general and limited partners, held for ten years.

Projected returns page with a return-on-investment chart and partner return tables
Projected returns.
Sensitivity table of profit across closing cap rates and changes in operating income
Sensitivity analysis.